Send Your Plans
Framing & Structural

Framing & Structural

Wall framing, floor systems, and roof structure, built square and on level to set up clean finish work later.

Wood framing and structural work on an active jobsite
What We Deliver

The structural scope, item by item

Wall framing, floor systems, roof structure, sheathing, and structural blocking, executed to project drawings and field conditions.

01

Wall Framing

Exterior and interior walls framed plumb, square, and on layout for the trades that follow.

02

Floor Systems & Joists

Floor joists, rim, and subfloor set level and on spacing for flat, stable finished floors.

03

Roof Framing

Rafters and trusses set to pitch and line and sheathed for the exterior envelope.

04

Sheathing

Wall and roof sheathing fastened to schedule, squaring the structure for load and shear.

05

Structural Blocking

Blocking and backing set for fixtures, cabinets, railings, and finishes to follow.

06

Repairs & Reinforcement

Joist sistering, level correction, and structural reinforcement on renovations and existing framing.

Why It Matters

Framing sets the tolerance for every phase that follows

Framing is the first scope built and the foundation every later phase inherits. Walls out of plumb, floors out of level, or rough openings out of tolerance carry through to drywall, cabinetry, and finish, where they become rework at closeout.

D'Matos delivers framing built square, level, and to drawings, with blocking set for the scopes that follow, so finish work goes in clean.

Structural framing in progress on site
The System

Scoped before we mobilize. Documented at closeout.

Scope confirmed before mobilization. Communication documented throughout. Closeout delivered without chasing.

Before

Scope defined before mobilization

Framing scope confirmed in writing, with plans, openings, and loads reviewed before mobilization.

During

Structured weekly updates

Weekly progress updates and documented change orders, so project status stays current.

After

Documented closeout

Inspection-ready framing, photos, and a documented handoff at closeout, completed without chasing.

Proof

The structure beneath the finish

Framing and structural work: wall framing, floor systems, and roof structure. Select an image to view it in detail.

Working on a project right now?

Send us your plans and get a detailed structural scope review back within one business day, at no cost.

Send Your Plans