Exterior envelope, decks, and trim: lap, shingle, and fiber cement siding, with the decks, railings, and flashing that tie into the finish scope.
Lap, shingle, and fiber cement siding, exterior trim, decks and rail systems, and flashing, executed to project drawings and field conditions.
Horizontal lap and clapboard installed to consistent exposure, with straight lines and even courses.
Cedar shingle and shake installed to even reveal, keyed and staggered across the wall.
Fiber cement (HardiePlank-type lap and panel) cut, gapped, and fastened to manufacturer specification.
Corner boards, frieze, window and door trim, and soffit and fascia run straight and ventilated to close the eaves and finish the roofline.
Window, door, and transition flashing integrated with the siding and house wrap to shed water.
Deck framing, decking, stairs, and rail systems built square, fastened to structure, and tied into the envelope.
Siding is the building's exterior envelope and its primary water management layer. The transitions where it meets windows, doors, trim, and flashing are where infiltration begins, and where detailing failures show up as callbacks.
D'Matos executes the exterior with the same detail applied to the interior: trim that frames clean, flashing integrated behind the siding, and transitions detailed to shed water, all tied into the finish scope.
Scope confirmed before mobilization. Communication documented throughout. Closeout delivered without chasing.
Siding scope confirmed in writing, with materials, exposures, and flashing details reviewed before mobilization.
Weekly progress updates and documented change orders, so project status stays current.
Weather-tight envelope, photos, and a documented handoff at closeout, completed without chasing.
Exterior siding and trim work: cladding, trim, soffit, and flashing detail. Select an image to view it in detail.
Send us your plans and get a detailed exterior scope review back within one business day, at no cost.
Send Your Plans